Steel Bridge October 2015 Update

Steel Bridge Team Tests Tools

The design is almost finalized, and by next month we’ll start cutting up the pieces and forming the actual 20-foot steel bridge for conference. In the meantime, we’re currently in the process of creating a small box out of scrap metal. We’ve already cut and grinded our pieces to the correct lengths, and now all we have left is welding everything together. Our next project will be to build a single truss out of the tubular steel left over from last year, to practice for the main bridge.

If you haven’t been involved yet, don’t worry there’s still plenty of time to come out and learn the machines, the design, and have fun!

Bridge Team October 2015