All posts by Jessica Maass

Steel Bridge December 2015 Update

It’s been a long and tedious semester for everyone, but Steel Bridge doesn’t stop just because projects and exams pop up! We’ve got our design finalized, our steel bought, and our members know all the ins and outs of working with the machines.

Steel Bridge 2015

Although we didn’t get a chance to do much fabrication this semester, it was great having all of our dedicated members come out every week! It’s definitely dirty work cutting and welding steel, but the Steel Bridge team is totally prepared for next semester. Once January rolls around we’ll be cranking out our 20-ft bridge, and getting ready for the competition in Long Beach!

Jessica Maass
USC ASCE Steel Bridge Captain 2015

Steel Bridge 2015

Steel Bridge October 2015 Update

Steel Bridge Team Tests Tools

The design is almost finalized, and by next month we’ll start cutting up the pieces and forming the actual 20-foot steel bridge for conference. In the meantime, we’re currently in the process of creating a small box out of scrap metal. We’ve already cut and grinded our pieces to the correct lengths, and now all we have left is welding everything together. Our next project will be to build a single truss out of the tubular steel left over from last year, to practice for the main bridge.

If you haven’t been involved yet, don’t worry there’s still plenty of time to come out and learn the machines, the design, and have fun!

Bridge Team October 2015