Tag Archives: Aesthetics

Partial Canoe Team with DiSCovery II.

PSWC 2014 Day 1: Canoe & Bridge Aesthetics

PSWC 2014 Started off with a beautiful day of Concrete Canoes and Steel Bridges on display!

The Steel Bridge team practices assembling their bridge.

Final PSWC 2014 Preparations

All of our design teams are busy with last-minute preparations for PSWC 2014. We’re off to San Diego tonight, excited to compete!

canoe-update

Concrete Canoe Update

We’ve been busy putting the finishing touches on our concrete canoe and its auxiliary components over the past few weeks. Our cut-away section is a seven-foot-long space shuttle, complete with red steel stands (not pictured):

space-shuttle-section

Our two stands include a massive asteroid (made out of concrete, of course), and a special robotic guest:

asteroid-stand

We’re building some other cool stuff, including a canoe, of course, but you’ll have to wait until PSWC to see everything else. For now check out the construction pics:

PSWC 2013 Day 1: Canoe & Bridge Aesthetics

The highlight of PSWC day 1 is the concrete canoe and steel bridge aesthetics competition. Since we’re hosting PSWC this year, the event took place at the heart of the USC campus, in Alumni Park. Various other events took place today, including the Environmental Design competition.

Last Minute PSWC Prep

Everyone’s finishing up last minute details for PSWC 2013, which starts tomorrow. Canoe team wrapped up aesthetics, our display board and engineer’s notebook. But—in a concrete canoe first—we had to make one last batch of concrete. But don’t worry, it was just to re-finish the cross section. It would never work to put new concrete on the canoe this late in the game. Steel bridge team finished up bridge painting and did their display board tonight. And the environmental team finished strategizing for their 8am Thursday competition, while other team members created the display board and other documentation. Meanwhile, our e-board finished orchestrating all of the logistics for the conference (since we’re hosting). Everything’s coming into place, and we’ll be back at it bright and early (in like 4 hours) to get everything for the first day of competition.

 

Design Team Prep for PSWC 2013 in Full Gear

As we approach the 2013 ASCE Pacific Southwest Conference (PSWC), our design teams are all working hard to complete their projects. Since USC is co-hosting PSCW this year, each team is taking extra care to produce an exceptional final product. PSWC events will take place on the USC campus on Thursday April 4th and Saturday April 6th, check out the full schedule here. If you’re at USC, you won’t want to miss the Concrete Canoe and Steel Bridge Aesthetics Competition from 8am-5pm on Thursday at Alumni Park. Here’s an update on each design team’s progress.

Concrete Canoe

Gold Canoe Angle

Our concrete canoe has been stained USC Gold and is almost ready for PSWC.

This year’s canoe is named “SC Traveler.” We’ve worked on the canoe for several hours every night this week, and it’s paid off. Despite some major time setbacks with mold removal, we’re ahead of schedule thanks to multiple tasks completed faster than expected, and we finished applying the stain and sealant today. Canoe races are on Friday, at the Santa Fe Dam.

We took a break from the canoe to make a dumpster run.

We took a break from the canoe to make a dumpster run.

The canoe aesthetics are also nearing completion. We plan to add our team name to the canoe in cardinal lettering tomorrow. We’ll also finish up our display board, which features an original, USC-themed design.

Environmental Team

Environmental Team members assemble their final water-distribution system.

Environmental Team members assemble their final water-collection system.

The environmental design team worked on assembling their final water collection system last night. Their competition leads off the main PSWC design team events, occurring at Pardee Plaza from 8am-12pm. Our team looks solid and the competition should be exciting.

Steel Bridge

Thomas Welds Bridge Parts

Thomas Welds Bridge Parts

The steel bridge team is also putting in long hours and nearing completion. Once the bridge itself is done, the team will determine and practice the bridge assembly orchestration. As with canoe, the bridge team will create their display board and other finishing elements in the few days before competition as well. The 2013 PSWC Steel Bridge competition takes place on Saturday April 6th from 7am-4pm at Pardee Plaza at USC.

Other Miscellaneous PSWC News and Events

Concrete Horseshoe Curing

Concrete Horseshoe Curing

In other news, the concrete horseshoes and concrete bowling ball have been formed and are ready for competition. There are many other exciting events going on at PSWC, so you should check out the schedule for details.

Our USC ASCE E-Board is finalizing event coordination as well. Over 1,000 bottled waters and other snacks and beverages were wheeled through the design team area to the PSWC storage room today. Other E-Board members worked on finalizing the USC ASCE members’ PSWC event schedules. Overall, it’s shaping up to be an exciting conference and we’re all anxiously awaiting the competitions!